The construction of the Serbia National Football Stadium has reached a critical milestonethrough the close collaboration and tireless efforts of the research team from the School of Civil Engineering at Southeast University (SEU) and Nanjing SEU Modern Prestressing Engineering Co., Ltd.,. The stadium's ring cable was successfully lifted and detached from its supports in less than a month. This achievement marks the transition of the cable net engineering into the high-altitude traction and tensioning phase.

As a key project under the Belt and Road Initiative, the Serbia National Football Stadium is the country's first 50,000-seat national comprehensive stadium compliant with FIFA and UEFA standards. The roof utilizes a cable-supported grid structure, where a lower cable net supports an upper steel grid. This design features a concise prestress flow, a lightweight structure, and an elegant aesthetic.The SEU team applied the "cable-first, steel-second" support-free construction technology to the project. This innovative approach has significantly reduced construction measure costs and shortened the project timeline.
Source: SEU News Network
Translated by: Leah Li
Edited by: Leah LI
