Xiaoping Li
English 丨 中文
Publications

2017 and Accepted

[1] Xiaoping Li, Lihua Qian, Rubén Ruiz. Cloud workflow scheduling with deadlines and time slot availability. IEEE Transactions on Services Computing. Accepted (10.1109/TSC.2016. 2518187).

[2] Xiaoping Li, Zhicheng Cai. Elastic Resource Provisioning for Cloud Workflow Applications. IEEE Transactions on Automation Science and Engineering. 2017,14(2):1195 – 1210.

[3] Xiaoping Li, Yulu Jiang, Rubén Ruiz. Methods for Scheduling Problems Considering Experience, Learning, and Forgetting Effects . IEEE Transactions on Systems, Man, and Cybernetics: Systems. Accepted (10.1109/TSMC. 2016.2616158).

[4] Long Chen, Xiaoping Li, Ruben Ruiz. Resource renting for periodical cloud workflow applications. IEEE Transactions on Services Computing. 2017. Accepted. Doi:10.1109/TSC.2017.2677450.

[5] Yamin Wang, Xiaoping Li, Rubén Ruiz, Shaochun Sui. An iterated greedy heuristic for mixed no-wait flowshop problems. IEEE Transactions on Cybernetics. 2017. Accepted. Doi: 10.1109/TCYB.2017.2707067.

[6] Zhicheng Cai, Xiaoping Li, Ruben Ruiz. Resource provisioning for task-batch based workflows with deadlines in public clouds, IEEE Transactions on Cloud Computing, 2017, Accepted. Doi:10.1109/TCC. 2017.2663426.

[7] Yamin Wang, Xiaoping Li, Rubén Ruiz. An Exact Algorithm for the Shortest Path Problem With Position-Based Learning Effects. IEEE Transactions on Systems, Man, and Cybernetics: Systems. Accepted (10.1109/TSMC.2016.2560418).

[8] Xia Zhu, Rubén Ruiz, Shiyu Li, Xiaoping Li. An effective heuristic for project scheduling with resource availability cost. European Journal of Operational Research. 2017, 257: 746–762.

[9] Zhicheng Cai, Xiaoping Li, Ruben Ruiz, Qianmu Li. A delay-based dynamic scheduling algorithm for bag-of-task workflows with stochastic task execution times in clouds. Future Generation Computer Systems, 2017, 71: 57-72.

[10] Zhicheng Cai, Qianmu Li, Xiaoping Li. Elasticsim: A toolkit for simulating workflows with cloud resource runtime auto-scaling and stochastic task execution times. Journal of Grid Computing, 2016, Accepted. DOI:10.1007/s10723-016- 9390-y.

[11] Long Chen, Xiaoping Li. Cloud Workflow Scheduling with Hybrid Resource Provisioning. Journal of Supercomputing, 2017, Accepted. DOI: 10.1007/s11227- 017-2043-5.

[12] Jie Zhu, Xiaoping Li. Scheduling for multi-stage applications with scalable virtual resources in cloud computing.International Journal of Machine Learning & Cybernetics, 2016DOI: 10.1007/s13042-016-0533-z.

  

2016

[1] Zhicheng Cai, Xiaoping Li, and Jatinder N. D. Gupta, Heuristics for provisioning services to workflows in XaaS Clouds, IEEE Transactions on Services Computing. 20169(2): 250 -263.

[2] Xiaoping Li, Tianze Jiang, Rubén Ruiz. Heuristics for periodical batch job scheduling in a MapReduce computing framework. Information Sciences. 2016, 326: 119-133.

[3] Jia Wang, Xiaoping Li. Task scheduling for MapReduce in Heterogeneous Networks. Cluster Computing. 2016, 19(1): 197-210.

[4] Zhuxi Chen, Xiaoping Li, J.N.D. Gupta. Sequencing the storages and retrievals for flow-rack automated storage and retrieval systems with duration-of-stay storage policy. International Journal of Production Research.2016, 54(4): 984-998.

[5] Xiaoping Li, Haiyan Xu, Minmin Li. A memory-based complete local search method with variable neighborhood structures for no-wait job shops.International Journal of Advanced Manufacturing Technology.2016, 87:1401–1408.

[6] Jie Zhu, Xiaoping Li. Elastic and flexible multi-stage task scheduling with deadline-constraint in clouds.  The 20th IEEE International Conference on Computer Supported Cooperative Work in Design. 286-291.

[7] Jie Zhu, Xiaoping Li, Rubén Ruiz, et al. Scheduling Stochastic Multi-stage Jobs on Elastic Computing Services in Hybrid Clouds. IEEE International Conference on Web Services. 2016:678-681.

  

2015

[1] Xia Zhu,  Xiaoping Li. An enhanced greedy random adaptive search procedure with path- relinking for no-wait flowshop problem with setup times.Integrated Computer-Aided Engineering.2015, 23(1): 51-68.

[2] Dandan Wang, Xiaoping Li. Quay Crane Scheduling with dual cycling. Engineering Optimization, 2015, 47(10): 1343-1360.

[3] Zhuxi Chen, Xiaoping Li, Jaint N.D. Gupta. A bi-directional flow-rack automated storage and retrieval system for unit-load warehouses. International Journal of Production Research. 2015, 53(14): 4176-4188.

[4] Yazhi Li, Xiaoping Li, Jatinder N.D. Gupta. Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search.  Expert Systems with Applications, 2015, 42(3):  1409-1417.

[5] Ning Liu, Xiaoping Li. Granulation-based Resource Classification in Cloud Manufacturing. Proceedings of the Institute of Mechanical Engineers Part B: Journal of Engineering Manufacture. 2015, 229(7): 1258 – 1270.

[6] Jie Yang, Xiaoping Li, Dandan Wang, Jia Wang. A Group Mining Method for Big Data on Distributed Vehicle Trajectories in WAN. International Journal of Distributed Sensor Networks. 2015, Article ID 756107, 9 pages, http://dx.doi.org/ 10.1155/2015/756107.

[7] Xiaoping Li, Long Chen, Haiyan Xu, Jatinder N.D. Gupta. Trajectory Scheduling Methods for minimizing total tardiness in a flowshop. Operations Research Perspectives. 2015, 2: 13–23.

[8] Xia Zhu, Xiaoping Li.Iterative search method for total flowtime minimization no-wait flowshop problem.  International Journal of Machine Learning and Cybernetics. 2015, 6(5):747-761.

[9] Jia Wang, Xiaoping Li, Jie Yang. Energy-aware Task Scheduling of MapReduce Cluster. 2015 International Conference on Services Science, Weihai, China. 187-194.

2014

[1] Ning Liu, Xiaoping Li, Weiming Shen. Multi-granularity resource virtualization and sharing strategies in cloud manufacturing. Journal of Network and Computer Applications. 2014, 46: 72-82.

[2] Dandan Wang, Anne Goodchild, Xiaoping Li, Zun Wang. Double Girder Bridge Crane with Double Cycling: Scheduling Strategy and Performance Evaluation. Journal of Applied Mathematics, 2014, Article ID 418689. (DOI: 10.1155/2014/ 418689)

  

2013

[1] Zhicheng Cai, Xiaoping Li, and Jatinder N. D. Gupta. Critical Path-Based Iterative Heuristic for Workow Scheduling in Utility and Cloud Computing. 11th International Conference on Service Oriented Computing (ICSOC 2013)LNCS Volume 8274:207-221.

[2] Zhicheng Cai, Xiaoping Li, and Jatinder N. D. Gupta. Bi-direction adjust heuristic for Workflow Scheduling in Clouds. The 19th IEEE International Conference on Parallel and Distributed Systems (ICPADS 2013) : 94-101.

[3] Yamin Wang, Xiaoping Li. Shuffled frog leaping algorithm for a bi-objective no-idle permutation flow shop. IEEE International Conference on Systems, Man, and Cybernetics (IEEE SMC2013). 2808-2812.

[4] Tian Chen, Xiaoping Li. Integrated Iterated Local Search for the Permutation Flowshop Problem with Tardiness. IEEE International Conference on Systems, Man, and Cybernetics (IEEE SMC2013). 2803-2807.

[5] Ning Liu, Xiaoping Li. A multilevel modeling framework for semantic representation of cloud manufacturing resources. 17th International Conference on Computer Supported Cooperative Work in Design (CSCWD). 2013: 400-405.

[6]Hong Shen, Xiaoping Li. Cooperative discrete particle swarms for multi-mode resource-constrained projects. 17th International Conference on Computer Supported Cooperative Work in Design (CSCWD). 2013: 31-36.

[7]Xia Zhu, Xiaoping Li, Qian Wang. An adaptive intelligent method for manufacturing process optimization in steelworks. 17th International Conference on Computer Supported Cooperative Work in Design (CSCWD). 2013: 363-368.

[8] JieYang, XiaopingLi, MapReduce based Method for Big Data Semantic Clustering, IEEE International Conference on Systems, Man, and Cybernetics (IEEE SMC2013). 2814-2819.

[9]Zhu, Xia ; Li, XiaopingGupta, Jatinder N. D.  Iterative algorithms for no-wait flowshop problems with sequence-dependent setup times. 25th Chinese Control and Decision Conference, 2013: 1252-1257.

[10] Xianzhang Chen, Xiaoping Li. A Dynamic Resource Balance Algorithm for Multi-tenant Placement Problem in SaaS. 2013 International Conference on Service Sciences (ICSS). 2013: 123-128.

  

2012

[1] Xiaooping Li, Yi Zhang. Adaptive hybrid algorithms for the sequence- dependent setup time permutation flow shop scheduling problem. IEEE Transactions on Automation Science and Engineering. 2012, 9(3):578-595.

[2] Jie Zhu, Xiaoping Li. An effective meta-heuristic for no-wait job shops to minimize makespan. IEEE Transactions on Automation Science and Engineering.2012, 9(1): 189-198.

[3] Jie Zhu, Xiaoping Li, Weiming Shen. A divide and conquer based greedy algorithm for 2-machine no-wait job shop problems with makespan minimization.International Journal of Production Research. 2012, 50 (10): 2692- 2704.

[4] Yi Zhang, Xiaoping Li. A Quantum-inspired Iterated Greedy Algorithm for Permutation Flowshops in a Collaborative Manufacturing Environment. International Journal of Computer Integrated Manufacturing. 2012, 25(10): 924-933.

[5] Zhicheng Cai, Xiaoping Li. A hybrid genetic algorithm for resource-constrained multi-project scheduling problem with resource transfer time. CASE 2012.

[6] Zhicheng CaiXiaoping Li , Long Chen. Dynamic programming for services scheduling with start time constraints in distributed collaborative manufacturing systems. SMC 2012.

[7] Long Chen, Xiaoping Li, Zhicheng Cai. Heuristic methods for minimizing resource availability costs in multi-mode project scheduling. SMC 2012.

[8] Ning Liu, Xiaoping Li. A resource virtualization mechanism for cloud manufacturing systems. International IFIP Working Conference on Enterprise Interoperability, 2012, 46-59.

[9] Minmin Li, Jie Zhu, Xiaoping Li. A memory and variable neighborhood structure based complete local search for the no-wait job shop problem. CSCWD 2012, 786-792.

[10] Peiying Hou , Dandan Wang, Xiaoping Li. An improved harmony search algorithm for blocking job shop to minimize makespan. CSCWD 2012, 763-768.

[11] Tao Xu, Xia Zhu, Xiaoping Li. Efficient iterated greedy algorithm to minimize makespan for the no-wait flowshop with sequence dependent setup times. CSCWD 2012, 780-785.

2011

[1] Yi Zhang, Xiaoping Li. Estimation of Distribution Algorithm for Permutation Flow Shops with Total Flowtime Minimization. Computers & Industrial Engineering. 2011, 60(4): 706-718.

[2] Jie Zhu, Xiaoping Li, Weiming Shen. Effective Genetic Algorithm for Resource- constrained Project Scheduling with Limited Preemptions.International Journal of Machine Learning and Cybernetics. 2011. 2(2): 55-65.

[3] 朱夏, 李小平, 王茜. 基于总空闲时间增量的无等待流水调度混合遗传算法. 计算机研究与发展. 2011, 48 (3): 455-463.

[4] Zhuxi Chen, Xiaoping Li. A RFID-based dual-command method for unit-load wareshouse systems. SMC 2011, 1026-1030.

[5] Ning Liu, Xiaoping Li, Qian Wang. A resource & capability virtualization method for cloud manufacturing systems. SMC 2011, 1003-1008.

[6] Dandan Wang, Xiaoping Li. A two-stage composite heuristic for dual cycling quay crane scheduling problem. SMC 2011, 1902-1907.

[7] Xia Zhu, Xiaoping Li, Qian Wang. An evolutionary algorithm for no-wait flowshop problems with flowtime minimization. CSCWD 2011, 8-10: 285-290.

[8] Jie Zhu, Xiaoping Li. An efficient metaheuristic for the blocking job shop problem with makespan minimization. ICMLC 2011, 1352-1357.

[9] Jie Zhu, Bo Gao, Zhihu Wang, Berthold Reinwald, ChangjieGuo, Xiaoping Li, Wei Sun. A dynamic resource allocation algorithm for Database-as-a-Service. ICWS 2011, 564-571.

2010

[1] Chuyang Wang, Xiaoping Li, Qian Wang. Accelerated Tabu Search for No-wait Flowshop Problem Scheduling with Maximum Lateness Criterion. European Journal of Operational Research, 2010, 206(1): 64-72.

[2] 王初阳,李小平,王茜,苑迎春. 有准备时间无等待流水车间调度的搜索算法. 计算机研究与发展. 2010, 47(4): 653-662.

[3] Jie Zhu, Xiaoping Li. An effective evolutionary algorithm for pre-emptive resource-constrained project scheduling problems. SMC 2010; 1973-1978.

[4] Yi Zhang, Zhihu Wang, Bo Gao, Changjie Guo, Wei Sun, Xiaoping Li. An Effective Heuristic for On-line Tenant Placement Problem in SaaS. ICWS 2010, 425-432.

[5] Yi Zhang, Xiaoping Li. A Quantum-inspired Iterated Greedy Algorithm for Permutation Flowshops with Total Flowtime Minimization. SMC 2010, 1912-1917.

[6] Jie Zhu, Xiaoping Li, Qi Hao, Weiming Shen. A new approach for resource-constrained multi-project scheduling. Reshaping Construction Practice: Construction Research Congress. 2010;1-10.

[7] Hong Shen, Ning Liu, Xiaoping Li, Qian Wang. A cooperative method for supervised learning in Spiking neural networks. CSCWD 2010, 22-26.

[8] Qiuxiang Cui, Xia Zhu, Yi Zhang, Xiaoping Li. SOA-based method for cooperative tasks distribution in large-scale optimization environments. CSCWD 2010, 340-344.

  

2009

[1] Xiaoping Li, Cheng Wu, Qian Wang. Efficient Composite Heuristics for Total Flowtime Minimization in Permutation Flow shops. OMEGA, 2009, 37(1): 155- 164.

[2] Yi Zhang, Xiaoping Li, Qian Wang. Hybrid genetic algorithm for permutation flowshop scheduling problems with total flowtime minimization. European Journal of Operational Research, 2009, 196(3): 869-876.

[3] Jie Zhu, Xiaoping Li, Qian Wang. Complete Local Search with Limited Memory Algorithm for No-Wait Job Shops to Minimize Makespan. European Journal of Operational Research, 2009, 198: 378-386.

[4] Yingchun Yuan, Xiaoping Li, Qian Wang. Deadline division based heuristic for cost optimization in workflow scheduling.Information Sciences, 2009179(4):2562- 2575.

[5] 朱夏, 李小平, 王茜. 基于目标增量的无等待流水调度迭代贪婪算法. 计算机学报, 2009, 32(1): 132-141.

[6] 苑迎春,李小平,王茜,张晓东. 基于优先级规则的网格工作流调度. 电子学报2009, 37(7): 1457-1464.

[7] 苑迎春, 李小平, 王茜. 成本约束的网格工作流费用优化算法. 计算机研究与发展. 2009, 45(2): 194-201.

[8] Yi Zhang, Xiaoping Li, Qian Wang. Similarity based Ant-colony algorithm for permutation flowshop scheduling problems with total flowtime minimization. CSCWD 2009, 582-589.

  

2008

[1] Xiaoping Li, Cheng Wu. Heuristic for no-wait flow shops with makespan minimization based on total idle-time increments. Science in China Series F: Information Sciences, 2008, 51(7): 896-909.

[2] 李小平, 吴澄. 基于总空闲时间增量的无等待流水作业计划优化算法. 中国科学: E. 2008, 38(12): 2199-2211.

[3] Xiaoping Li, Qian Wang, Cheng Wu. Heuristic for No-Wait Flow Shops with Makespan Minimization. International Journal of Production Research, 2008, 46(9): 2519-2530.

[4] 苑迎春, 李小平, 王茜. 基于逆向分层的网格工作流调度算法. 计算机学报, 2008, 31(2): 282-290.

[5] 张晓东, 李小平, 王茜. 服务工作流的混合粒子群调度算法. 通信学报, 2008, 29(8): 87-93.

[6] 苑迎春, 李小平, 王茜. 基于串归约的网格工作流费用优化方法. 计算机研究与发展, 2008, 45(2): 246-253.

[7] Yi Zhang, Xiaoping Li, Jie Zhu, Qian Wang. Composite heuristic algorithm for permutation flowshop scheduling problems with total flowtime minimization. CSCWD 2008, 903-907.

[8] Chuyang Wang, Xiaoping Li, Qian Wang, Jie Zhu. Iterative local search algorithm for no-wait flowshop scheduling problems to minimize makespan. CSCWD 2008, 908- 912.

[9] Jie Zhu, Xiaoping Li, Yi Zhang, Qian Wang. Meta-Heuristic for No-Wait Job Shops with Makespan Minimization. CSCWD 2008, 874-879.

[10] Qingqing Wang, Xiaoping Li, Qian Wang. Semantic web services based data exchange for distributed and heterogeneous systems. 4th International Conference on Interoperability for Enterprise Software and Applications, 2008, 315-327.

[11] Yougen Liu, Xia Zhu, Xiaoping Li. A new hybrid genetic algorithm for the Bi-criteria no-wait flowshop scheduling problem with makespan and total flow time minimization. ICMLC 2008, 883-888.

[12] Ning Yang, Xiaoping Li, Jie Zhu, Qian Wang. Hybrid Genetic-VNS algorithm with total flowtime minimization for the no-wait flowshop problem. ICMLC 2008, 935- 940.

[13] Xia Zhu, Xiaoping Li, Qian Wang. Objective increment based hybrid GA for no-wait flowshops. ICMLC 2008, 969-975.

[14] Feng Wang, Xiaoping Li, Qian Wang. Schema matching based on weighted fuzzy concept lattice. International Conference on Computer Science and Software Engineering, 2008, 508-511.

2007 and before

[1] Yinchun Yuan, Xiaoping Li, Qian Wang, Xia Zhu. Cost Optimization Method for Workflows with Deadline Constraints in Grids. CSCWD 2007, 783-788.

[2] Xia Zhu, Xiaoping Li, Qian Wang. Hybrid heuristic for total flowtime minimization in no-wait flow shops. CSCWD 2007, 1050-1054.

[3] Yi Zhang, Xiaoping Li, Qian Wang. Web service based method for large scale flow shops with flowtime minimization. CSCWD 2007, 484-489.

[4] Xiaodong Zhang, Qian Wang, Xiaoping Li. Multi-agent based framework for dynamic scheduling system. ICMLC 2007, 3838-3843.

[5] Xiaoping Li, Qian Wang. Heuristics for permutation flow shops to minimize total flowtime. CSCWD 2006, 107-111.

[6] Xiaoping Li, Qian Wang, Cheng Wu. An Efficient Method for No-Wait Flow Shop Scheduling to Minimize Makespan. CSCWD 2006, 1296-1301.

[7] Xiao-ping Li, Qian Wang. A composite algorithm for total completion-time minimization in large flow shop scheduling. ICMLC 2006, 2439-2443.

[8] Xiaoping Li, Qian Wang. Iterative Heuristics for Permutation Flow Shops with Total Flowtime Minimization. BASYS 2006, 349-356.

[9] Yingchun Yuan, Xiaoping Li, Qian Wang. Time-Cost Tradeoff Dynamic Scheduling Algorithm for Workflows in Grids. CSCWD 2006, 872-877.

[10] Yin-yun Shen, Xiao-ping Li, Qian Wang, Ying-chun Yuan. A hybrid QOS-based algorithm for independent tasks scheduling in Grid. ICMLC 2006, 4511-4515.

[11] Xiao-ping Li, Cheng Wu. An efficient constructive heuristic for permutation flow shops to minimize total flowtime. Chinese Journal of Electronics, 2005, 14(2): 203- 208.

[12] 李小平,徐晓飞. 非同起点加工的多机调度合成算法. 计算机学报, 2002, 25 (8)817-822.

[13] 李小平,徐晓飞,战德臣. 一种独立任务的同型机调度快速算法. 软件学报, 2002, 13 (4): 812-817.